INFERENCE CAPACITY
ERCOT SOUTH . CENTRAL TEXAS

PROJECT SANTOS

A 50 MW, Tier 3 data center in the ERCOT South load zone near Austin, Texas. Engineered for high-density AI inference and delivered in two phases.

PROJECT SANTOS
DATA CENTER
50 MW
Tier 3 facility
IT LOAD
34.3 MW
Available at full build
AVAILABILITY
2 Phases
Q1 2027 and Q2 2028

Built for High-density AI

01COMPUTE
  • NVIDIA Blackwell architecture, NVL72 GB300
  • Configured in 18 full-rack modules
  • 140 kW per rack, 4.8 MW total
02ENERGY
  • ERCOT South load zone, near Austin, TX
  • 50 MW total load
  • 7.2 MW currently energized
  • 42.8 MW additional capacity, Q2 2028
03Fiber CONNECTIVITY
  • 100 to 800 Gbps with low latency
  • Two redundant fiber lines from separate providers
04LOCATION
  • Within 40 miles of Austin and Central Texas
  • In the broader demand orbit, positioned outside the most crowded core sites
  • Utility-approved roadmap for future expansion

Data Center Design

COOLING
MINIMAL WATER USE
A closed-loop water and propylene glycol cooling system built to sustain intense, high-density GPU deployment while keeping water use to a minimum.
EFFICIENCY
Optimized for Scale
Built for low PUE and tuned for large-scale, high-density AI inference, so more of the facility's power goes to compute.
MANUFACTURING
Reduced Time
US-assembled, skid-mounted modular data centers are built off site in a controlled factory environment, so the facility deploys with less on-site construction than a traditional build.
LOCAL ECONOMY
Creating jobs and local investment
Construction and operation of the facility support skilled trades, local contractors, and long-term high-tech roles, adding investment and employment to the Central Texas economy.
COMMUNITY
A LOW-IMPACT NEIGHBOR
Designed to be a good neighbor. The modular facility is built off site and installed with minimal on-site construction, and it sits outside the region's most congested data center markets to limit its footprint on the surrounding community.
LONG-TERM INVESTMENT
LONG-TERM COMMUNITY INVESTMENT
A lasting commitment to the region, bringing sustained local investment and high-tech activity to Central Texas as the site scales from Phase 1 to full capacity.

Two Phases to Full Capacity

PHASE 1
Deployable Q1 2027
Convert live power
4.8 MW IT load
7.2 MW currently energized for Bitcoin mining, converting to 4.8 MW of IT load for AI deployment.
PHASE 1
PHASE 2
Deployable Q2 2028
Substation build
34.3 MW IT load
Additional 42.8 MW through a utility-approved substation build, delivering 34.3 MW of IT load.
PHASE 2

7.2 MW Live, 50 MW Total

7.2 MW is energized today. The remaining 42.8 MW is a utility-approved roadmap, delivered through a substation build that brings the site to 50 MW.
7.2 MW ENERGIZED
Enterprise Customers Onboarded
Campus Expansion Initiated
50 MW TOTAL

Central Texas Advantage

Located strategicially within Central Texas, Project Santos sits in the broader Austin demand orbit while avoiding the over-concentrated power constraints of typical metro-core facilities.
A1GRID STABILITY

Located directly within the resilient ERCOT South network, ensuring consistent, multi-megawatt operational uptime.

A2STRATEGIC PROXIMITY

Close to key Austin technology corridors, providing rapid developer and engineering team physical access.

A3FLEXIBLE OFFTAKE

A tailored structure designed to support modern high-performance workloads, offering highly competitive rates.

A4EXPANSION SECURITY

Secure your immediate footprint with the reassurance of a pre-approved utility path to grow with demand.

Central Texas Advantage
Total Area: 414,188 ft²
Total Distance: 2,560 ft
  • ERCOT South load zone
  • Within 40 miles of Austin, Central Texas
  • Utility-approved expansion roadmap

Who This is For

A long-term inference partner

We are seeking a foundational enterprise partner who aligns with the operational scope and physical scale of the Project Santos asset.

01 / TARGET CLIENT
Long-term inference client
02 / TERM STRUCTURE
3-year minimum end-user agreement with defined offtake
03 / EXPANSION PRIORITY
Phase 1 participation guarantees priority selection for Phase 2 capacity
GET IN TOUCH

Reserve capacity in ERCOT South

Secure immediate Phase 1 footprint and claim priority reservation rights for the 42.8 MW utility-approved Phase 2 expansion.

Contact the team
PROJECT
Project Santos
REGION
ERCOT South . Austin, TX
CAPACITY
50 MW . 34.3 MW IT load